Renovation of high-rise building at Lake Constance

Lake Constance, Switzerland

Project description
As part of a renovation project, new recesses were reinforced over 14 floors. With the pre-stressed re-plate laminae an optimal load redistribution could be achieved in order to meet the requirements of load safety and usability.

re-fer product
The memory steel lamina re-plate was fixed to the structure with a Hilti end anchorage and heated with re-fer infrared heater re-IR 3000 to activate the prestressing.

Location
Lake Constance, Switzerland

Year
2018

Construction firm
re-fer technical service

Info
Reinforcement of recesses

 

Scroll To Top